The 3C MENTOR/Totally Awesome Bundle- The Lot!!

  • $5,000 or 6 monthly payments of $1,000

Totally Awesome Bundle- The Lot!!

All of the current published documents bundled together at a heavily discounted price and available to download for a complete set.
Price incl GST

Contents

  • $150

Calculator- 04.14 Cost Movement Allowance (CMA) Calculator

The Cost Movement Allowance (CMA) Calculator is designed to calculate the amount of cost movement or change to the typical house construction costs over a period of 12 months. It would typically be reviewed every quarter.

  • $30

Calculator - 06.40 EOT and LD (Liquidated Damages) Calculator

This calculator is used to calculate extension of time periods, liquidated damages amounts and overdue interest amounts for use in making the various claims to client/s . Price incl GST

  • $100

Calculator- 10.04 Margin Structure Calculator

Understanding how your margins are built up is a key to any successful business. This template allows you to see what your margins should be. Price incl GST

  • $30

Checklist - 06.14 - Contract Preparation

A checklist covering all the important items required when preparing a building contract. Price incl GST

  • $30

Checklist - 06.15 - Contract Signing

A checklist covering all the important items required when signing a building contract. Price incl GST

  • $30

Checklist - 06.16 - BA Lodgement

A checklist covering all the important items required to do when lodging an application for building approval. Price incl GST

  • $30

Checklist - 06.19 - Handover Preparation

A checklist covering all the important items required when preparing the information and documents for the handover of a new home. Price incl GST

  • $30

Checklist - 06.20 - Handover

A checklist covering all the important items required at the time of handover of a new home. Price incl GST

  • $60

Checklist - 07.01 Drafting Checklist

A checklist covering all the important items required on working drawings for a new home.  Price incl GST

  • $60

Checklist - 07.04 Design Documentation Guide

This guide sets out the drawings or plans that should be included with each phase of the tender and contract preparation for a new home build. Price incl GST

  • $30

Checklist - 08.20 Site Establishment Checklist

A checklist to be used for starting a new project including some pre-start items and the site establishment items. Also includes items for townhouse projects. Price incl GST

  • $30

Checklist - 08.36 - Handover On-Site

A checklist covering all the important items for site supervisor to go over and cover off with the new owners at a handover on-site. Price incl GST

  • $30

Checklist - 09.06 Employee Interview Record and Checklist

A checklist covering all the important items to discuss during an interview with a potential new employee.  Price incl GST

  • $30

Checklist - 09.11 Hiring Process

A checklist covering all the important items required during the process of hiring a new employee.  Price incl GST

  • $30

Checklist - 09.15 New Staff Checklist

A checklist covering all the important items to provide and discuss with a new employee when starting with your business.  Price incl GST

  • $30

Checklist - 09.19 Employee Exit

A checklist covering all the important items that need to be returned or terminated when an employee leaves the employ of a business.  Price incl GST

  • $60

Construction Program-105 Days-Two Storey

Brick Veneer for use in Qld Price incl GST

  • $60

Construction Program-115 day- 2 Storey-Clad-Full Turnkey

Two storey home with lightweight cladding floor coverings and landscaping Price incl GST

  • $60

Construction Program-115 Day-2 Storey-Full Turnkey

Brick Veneer 2 storey home with floor coverings and landscaping Price incl GST

  • $60

Construction Program-120 days- 2 Storey-Clad- Full Turnkey

Two storey home using an alternate six progress claims program with lightweight cladding, timber floor and carpet and landscaping Price incl GST

  • $60

Construction Program-150 Day-Three Storey-Full Turnkey

Lightweight cladding with pool, timber floor and landscaping - for use in Qld Price incl GST

  • $60

Construction Program-80 day Single Storey

Brick Veneer for use in Qld Price incl GST

  • $60

Construction Program-90 day Single Storey -Full Turnkey

Brick Veneer for use in Qld Price incl GST

  • $30

Form - 04.15 New Contractor Checklist and Information Form

Form template for use when starting new trade contractors to obtain their relevant details.  Price Incl GST

  • $30

Form - 08.12 ETS Approval Form

Form template for use when gaining the approvals for the extra costs related to an invoice Price Incl GST

  • $30

Form - 09.17 Employee Request to Change Bank Details

Form template for use when an employee requires changes to his/her bank details.  Price Incl GST

  • $20

Form - 09.18 Leave Application Request

Form template for use by staff when requesting leave from the business and to gain the manager's approval before accounts process the payroll changes.  Price Incl GST

  • $30

Form - 16.02 Training Request Form

Form template for staff to use when requesting training related to their role.  Price Incl GST

  • $20

Form - 16.05 Training Attendance Form

Form template for use when staff attend training courses and the training is to be recorded so it can be reviewed during a performance review.  Price Incl GST

  • $20

Form - 18.02 Standard Minute Form

Form template that can be used for recording or preparing minutes of a meeting Price Incl GST

  • $30

Form - 18.03 Expense Reimbursement Form

Form template for use when staff need to claim business expenses paid for on their own credit card.  Price Incl GST

  • $30

Form 18.04 Complaints Form

Form template for use when staff need to submit a complaint to management.  Price Incl GST

  • $20

Guideline - 00.01 How to Create a Purpose or Vision Statement

A Purpose or Vision Statement provides the direction and clarity for the whole business. Getting your Purpose or Vision right is the key for everything to follow. Price Incl GST

  • $20

Guideline - 00.02 How to Create a Mission Statement

A Mission Statement sets out the 'how' or the ways in which your business will achieve its 'Vision' or 'Purpose'.  A Mission Statement can be made up of a number of supporting statements that are to be achieved by different parts of the business to deliver the 'Vision'. Price Incl GST

  • $20

Guideline - 00.03 How to Create Your Core Values

Your Core Values are the 'actions' or behavioral characteristics that your business displays to your customers and to the world . This guideline provides a method to discover and establish your 'core values' for your business. Price Incl GST

  • $20

Guideline - 00.06 - Social Responsibility Strategy

A Social Responsibility Policy sets out your commitment to the community, your staff and to the environment and guides your behavior across the business in relation to these areas. Price Incl GST

  • $20

Guideline - 00.08 How to Prepare Your Business Model

This guideline will help you prepare your Business Model in a way that you will be able to 'see your business' and understand better how to link all the aspects of your business together. It can also help you develop a strategic plan based on what is required to complete your business model for where you want to be with your business in say 3-5 years time. Incl GST

  • $20

Guideline - 00.09 How to Prepare a Business Plan

This guideline will help you prepare a business plan for your business. It takes you through the steps needed to pull together all the information needed in a business plan. Incl GST

  • $20

Guideline - 01.02 How to Create Your Value Propositions

Your 'Value Propositions' are the elements of your business that set you apart from other similar businesses. This guideline helps you discover what your unique propositions are and how to articulate them to your customers. Price Incl GST

  • $20

Guideline - 01.03 Marketing Plan

A Marketing Strategy will provide direction and clarity to your marketing program and ensure correct emphasis is provided to the best channels for your target market/s. Price Incl GST

  • Free

Guideline - 08.13 ETS Code Explanatory Guide

A guide that explains the codes that should or can be used for 'coding' the extra purchase orders related to extra cost/s on projects.  Price Incl GST

  • $20

Guideline - 14.02 Waste Management Strategy

This template is for a sample Waste Management Strategy that is used to set out how your business will deal with waste on the projects. Price incl GST

  • $30

Letter - 06.27 Fence Contribution Letter Template

Template letter for use when seeking a contribution of theneighbour to the costs of boundary fencing Price incl GST

  • $30

Letter - 06.30 Proof of Title Template

This template letter is for use when requesting Proof of Title from the Owner of the land to be built on. Price incl GST

  • $30

Letter - 06.31 Provisional Sum Followup Letter Template

This letter template is used to confirm the Provisional Sums (PS) to a client and can be accompanied by a post contract variation to adjust the contract price. Price incl GST

  • $30

Letter - 06.32 Prime Cost Followup Letter Template

This letter template is used when providing supporting information to adjust the Prime Cost (PC) sums in a new home building contract. It would be used in conjunction with a post contract variation. Price incl GST

  • $30

Letter - 06.34 Construction Commencement Letter Template

This letter template is used as a sample of a Construction Commencement Letter to notify clients when construction has commenced on their new home. Price incl GST

  • $30

Letter - 06.35 Post Contract Variation Letter Template

This letter template is used a a sample of a Post Contract Variation to be used with a new home building contract. Price incl GST

  • $30

Letter - 06.36 Progress Claim Cover Letter Template

This letter template is used to accompany a progress claim invoice. It explains what the client is required to do in actioning the claim rather than sending just an invoice. Price incl GST

  • $30

Letter - 06.38 Building Variation Letter Template

This letter template is used when sending a post contract variation while the project is under construction. Price incl GST

  • $30

Letter - 06.39 EOT (Extension of Time) Claim Letter Template

This letter template is used when sending an Extension of Time claim to a client. Price incl GST

  • Free

Operations Manual Divider Sheets

These divider sheets will enable you to create an Operations Manual folder with all the sections divided according to the functional area of the business.

  • $30

Process Map - 02.00 Overall Building Process

Maps out the process for the overall pre-construction and construction stages of a new home   Price incl GST

  • $30

Process Map - 02.01 Lead Management to Initial Sale

Maps out the process and procedures from Lead Generation to making the Initial Sale Price incl GST

  • $30

Process Map - 04.01 Job Acceptance

Maps out the process and procedures when accepting a new job from Sales into the Office system  Price incl GST

  • $30

Process Map - 04.02 Preliminary Tender

Maps out the process and procedures for preparing a Preliminary Tender or Quote  Price incl GST

  • $30

Process Map - 04.03 Final Tender

Maps out the process and procedures for prepareing the Final Tender or Quote before going to Contract  Price incl GST

  • $30

Process Map - 05.01 Colour Selection

Maps out the process and procedures associated with incorporating a Colour Selection into the final pricing before Contract  Price incl GST

  • $30

Process Map - 06.01 Contract Preparation and BA Lodgement

Maps out the process and procedures from Contract Preparation to lodging a Building Application  Price incl GST

  • $30

Process Map - 06.04 BA to Site File

Maps out the process and procedures from Building Approval to Issuing a Site File to construction  Price incl GST

  • $30

Process Map - 08.00 Construction Stages

Maps out the process and procedures during the construction stages from start to handover  Price incl GST

  • $30

Process Map - 08.01 New Contractor Pre-Start

Business process mapping visually defines each of the main processes and systems that are used to efficiently operate your business. The process of undertaking the mapping can identify duplication, inefficiencies within your business and clarify who is responsible for the work.

  • $30

Process Map - 08.04 Extra to Schedule (ETS) Process

Maps out the process and procedures for processing invoices that are an extra cost to the project.  Price incl GST

  • $30

Process Map - 08.07 Display Homes and Construction Review

Maps out the process and procedures for undertaking a construction review of methods and of a new display home under construction  Price incl GST

  • Free

QA Checklist - 13.03.01 Contents and Preliminaries

This document sets out the QA checklists available during construction plus an explanation of how to use the checklists and a Site File Checklist to use before construction commences. This forms the preliminary documents to combine with all the required QA checklists. Price incl GST

  • $30

QA Checklist - 13.03.02 Base Stage - Slab Pre-Pour [Waffle]

QA checklist to use when inspecting and approving the slab preparation prior to the concrete pour. Price incl GST

  • $30

QA Checklist - 13.03.03 Base Stage - Slab -Day of Pour

QA checklist to use when inspecting and approving the slab on the day of the concrete pour. Price incl GST

  • $30

QA Checklist 13.03.04 Frame Stage - Frame [Timber]

QA checklist to use when inspecting and approving the timber frame before the roof is installed. Price incl GST

  • $30

QA Checklist 13.03.05 Frame Stage - Frame [Steel]

QA checklist to use when inspecting and approving the steel frame prior to installing the roof. Price incl GST

  • $30

QA Checklist 13.03.06 Frame Stage - Lockup

QA checklist to use when inspecting and approving the construction ready to proceed to lockup with external cladding and internal plasterboard. Inlcudes frame straighten, electrical and plumbing rough-ins, external windows and doors and roof covering. Price incl GST

  • $30

QA Checklist 13.03.07 Enclosed Stage - Brickwork

QA checklist to use when inspecting and approving the brickwork on a project. Price incl GST

  • $30

QA Checklist 13.03.08 Enclosed Stage - Lightweight Cladding

QA checklist to use when inspecting and approving the lightweight cladding before the external painting commences. Price incl GST

  • $30

QA Checklist 13.03.09 Enclosed Stage - AAC Cladding

QA checklist to use when inspecting and approving the AAC cladding on a project. Price incl GST

  • $30

QA Checklist 13.03.10 Enclosed Stage - Plasterboard

QA checklist to use when inspecting and approving the plasterboard prior to painting. Price incl GST

  • $30

QA Checklist 13.03.11 Fix Out Stage

QA checklist to use when inspecting and approving the works prior to painting. It covers carpentry, stairs, cabinets and tiling. Price incl GST

  • $30

QA Checklist 13.03.12 Final Stage - Painting

QA checklist to use when inspecting and approving the painting works on a project. Price incl GST

  • $30

QA Checklist 13.03.13 Final Stage - Fit Off

QA checklist to use when inspecting and approving the final completion of the project. Price incl GST

  • $30

QA Checklist 13.03.14 Pre-Handover

QA checklist to use when checking all items, certificates and house is ready for the handover to the client. Price incl GST

  • Free

Register - 00.15 Risk Register

Get all your business risks together in one place

  • $60

Register - 16.03 Training and Career Development Register

Template to be used to record the training and professional development needs of staff for the next 12 months. This works together with a Performance Review where training needs are highlighted. Price Incl GST

  • $60

Register - 16.04 Individual Training and Career Development Register

Template to be used to record the training and professional development needs of individual staff members for the next 12 months. This works together with a Performance Review where training needs are highlighted. Price Incl GST

  • $60

Scope of Works - 15.02.0001 General Requirements-SubContractor

This Scope of Works sets out the general requirements for all subcontractors that will apply on all building sites and covers items such as compliance, materials and execution that is not covered by the Standing Agreements and WH&S obligations. These General Requirements are to accompany every trade specific Scope of Works to ensure all obligations are covered.  Price incl GST

  • $60

Scope of Works - 15.02.0030 Building Designer

This Scope of Works sets out the extent of work and expectations of the standards and execution for the building design on projects. Price incl GST

  • $60

Scope of Works - 15.02.0035 Architect

This Scope of Works sets out the extent of work and expectations of the standards and execution for an architect on projects. Price incl GST

  • $60

Scope of Works - 15.02.0050 Structural Engineer

This Scope of Works sets out the extent of work and expectations of the structural engineer on projects. Price incl GST

  • $60

Scope of Works - 15.02.0200 Temporary Security Fencing

This Scope of Works sets out the extent of work and expectations for the supply and installation of temporary security fencing on projects. Price incl GST

  • $60

Scope of Works 15.02.0205 Temporary Site Power Supply

This Scope of Works sets out the extent of work and expectations for the supply and installation of temporary power supply on projects. Price incl GST

  • $60

Scope of Works - 15.02.0415 Earthworks

This Scope of Works sets out the extent of works and expected execution of the works in relation to all earthworks and site works on a project.  Price incl GST

  • $60

Scope of Works - 15.02.0480 Surveyor

This Scope of Works sets out the extent of work and expectations of the  execution for the surveyor on projects. Price incl GST

  • $100

Scope of Works - 15.02.0515 Drainer

This Scope of Works sets out the extent of work and expectations of the workmanship and execution for the drainage works on projects.  Price incl GST

  • $100

Scope of Works - 15.02.0570 Concreter

This Scope of Works sets out the extent of work and expectations of the workmanship and execution for the concreting works on projects. Price incl GST

  • $60

Scope of Works - 15.02.0670 Structural Steelwork

This Scope of Works sets out the extent of work and expectations of the workmanship and execution for the structural steel works on projects. Price incl GST

  • $100

Scope of Works - 15.02.0695 Carpenter - Frame

This Scope of Works sets out the extent of work and expectations of the workmanship and execution for the carpentry framing work on projects. Price incl GST

  • $60

Scope of Works -15.02.0710 Scaffolding -Lightweight, Void, Edge and Fall Protection

This Scope of Works sets out the extent of work and expectations of the supply and erection of the lightweight scaffold, void protection, edge protection and roof fall protection on projects.  Price incl GST

  • $60

Scope of Works - 15.02.0725 Scaffolding - Full Stage

This Scope of Works sets out the extent of work and expectations of the supply and erection of the full stage scaffolding on projects.  Price incl GST

  • $100

Scope of Works 15.02.0735 Metal Fascia and Gutter

This Scope of Works sets out the extent of work and expectations of the workmanship and execution for the metal fascia and gutter installation on projects. Price incl GST

  • $100

Scope of Works 15.02.0740 Metal Roofing

This Scope of Works sets out the extent of work and expectations of the workmanship and execution for the installation of metal roofing on projects. Price incl GST

  • $60

Scope of Works 15.02.0745 Roof Tiler

This Scope of Works sets out the extent of work and expectations of the workmanship and execution for the roof tiling works on projects. Price incl GST

  • $100

Scope of Works 15.02.0785 Electrician

This Scope of Works sets out the extent of work and expectations of the workmanship and execution for the electrical works on projects. Price incl GST

  • $100

Scope of Works 15.02.0795 Plumber

This Scope of Works sets out the extent of work and expectations of the workmanship and execution for the plumbing works on projects. Price incl GST

  • $60

Scope of Works 15.02.0805 Air Conditioning

This Scope of Works sets out the extent of work and expectations of the workmanship and execution for the air conditioning installation on projects. Price incl GST

  • $60

Scope of Works 15.02.0815 Mechanical Ventilation

This Scope of Works sets out the extent of work and expectations of the workmanship and execution for the mechanical ventilation installations on projects. Price incl GST

  • $60

Scope of Works 15.02.0900 Carpenter -Lockup

This Scope of Works sets out the extent of work and expectations of the workmanship and execution for the works carried out by the carpenter when straightening the frame, installing the external windows and doors, installing the bath frame and completing the frame QA check on projects. Price incl GST

  • $100

Scope of Works 15.02.0950 Bricklayer

This Scope of Works sets out the extent of work and expectations of the workmanship and execution for the bricklaying works on projects. Price incl GST

  • $60

Scope of Works 15.02.0980 Blocklayer

Scope of Works sets out the extent of work and expectations of the workmanship and execution for the blockwork on projects. Price incl GST

  • $60

Scope of Works 15.02.0995 AAC Cladding

This Scope of Works sets out the extent of work and expectations of the workmanship and execution for the installation of AAC cladding work on projects. Price incl GST

  • $100

Scope of Works 15.02.1015 Carpenter - Eaves and Cladding

This Scope of Works sets out the extent of work and expectations of the workmanship and execution for the carpenter installing eaves and external cladding works on projects. Price incl GST

  • $60

Scope of Works 15.02.1040 Renderer - DULUX

This Scope of Works sets out the extent of work and expectations of the workmanship and execution for the rendering works on projects using Dulux products. Price incl GST

  • $60

Scope of Works 15.02.1040 Renderer -GRANOSITE

This Scope of Works sets out the extent of work and expectations of the workmanship and execution for the rendering works on projects using 'Granosite' products. Price incl GST

  • $100

Scope of Works 15.02.1045 Plasterer-Internal Linings

This Scope of Works sets out the extent of work and expectations of the workmanship and execution for the internal plasterboard lining installation on projects. Price incl GST

  • $60

Scope of Works 15.02.1055 Waterproofer

This Scope of Works sets out the extent of work and expectations of the workmanship and execution for the waterproofing works on projects. Price incl GST

  • $100

Scope of Works 15.02.1080 Carpenter - Fixout

This Scope of Works sets out the extent of work and expectations of the workmanship and execution for the the installation of the internal doors, mouldings, built-in shelving and other internal carpentry works on projects. Price incl GST

  • $60

Scope of Works 15.02.1110 Cabinetmaker

This Scope of Works sets out the extent of work and expectations of the workmanship and execution for the kitchen and wet area cabinets and any other cabinetry work on projects. Price incl GST

  • $60

Scope of Works 15.02.1120 Stone Benchtops

This Scope of Works sets out the extent of work and expectations of the workmanship and execution for the installation of stone benchtops on projects. Price incl GST

  • $60

Scope of Works 15.02.1145 Tiler

This Scope of Works sets out the extent of work and expectations of the workmanship and execution for the tiling works on projects. Price incl GST

  • $60

Scope of Works 15.02.1200 External Screens and Shutters

This Scope of Works sets out the extent of work and expectations of the workmanship and execution for the installation of external screens and shutters on projects. Price incl GST

  • $60

Scope of Works 15.02.1250 Painter -DULUX

This Scope of Works sets out the extent of work and expectations of the workmanship and execution for the painting works using 'Dulux' products on projects. Price incl GST

  • $60

Scope of Works 15.02.1250 Painter - WATTYL I.D.

This Scope of Works sets out the extent of work and expectations of the workmanship and execution for the painting works using Wattyl I.D products on projects. Price incl GST

  • $60

Scope of Works 15.02.1250 Painter - WATTYL Project

This Scope of Works sets out the extent of work and expectations of the workmanship and execution for the painting works using Wattyl 'Project' products on projects. Price incl GST

  • $60

Scope of Works 15.02.1405 Carpenter - Final Fit

This Scope of Works sets out the extent of work and expectations of the workmanship and execution of the installation of the final fit items by the carpenter on projects. Price incl GST

  • $60

Scope of Works 15.02.1425 House Cleaner

This Scope of Works sets out the extent of work and expectations of the cleaning at the various stages by a contracted cleaner on projects. Price incl GST

  • $30

Template - 00.11 Goals, Objectives and Tasks

This template can be used to capture all the goals, objectives and tasks as a result of a strategic plan review, business planning or any other business process improvement that needs to capture the actions . Price incl GST

  • $60

Template - 00.13 Business Reporting Framework

Not sure what reports you need for your business? This template is a framework that outlines the various reports required by a residential building business with frequency and by functional areas. Price incl GST

  • $30

Template - 00.14 Meeting Schedule

This template can be used for setting up a meeting schedule, agenda or recording the minutes. Price incl GST

  • $30

Template - 02.06 Display Home Condition Report

This template is a guide for a report to management about the condition of the display home or sales office. This helps monitor the work by the cleaners and gardeners. Price incl GST

  • $30

Template - 02.07 Display Home Maintenance Request

This template provides a guide to create a process for requesting maintenance around a display home or sales office. The pre-formatted layout takes the guesswork out of the inspection process by sales staff. Price incl GST

  • $30

Template - 02.08 Sales Staff Safety Procedures

This template is for the safety procedures for sales  staff in display homes or in sales offices associated with a medium density project or housing development. Price incl GST

  • $60

Template - 02.09 Scope of Works - Display Home Cleaning

This Scope of Works sets out the extent of work and expectations for the cleaning of display homes and sales offices. Price incl GST

  • $60

Template - 02.10 Scope of Works - Display Home Landscape Gardener

This Scope of Works sets out the extent of work and expectations of the maintenance of the gardens around a display home or sales office by a landscape gardener. Price incl GST

  • $30

Template - 05.03 External Colour Selection Schedule

This template can be used for the colour selections to the external parts of a new home. Price incl GST

  • $30

Template - 05.04 Internal Colour Selection Schedule

This template is to capture and communicate the internal colour selection items in a new home. Price incl GST

  • $30

Template - 06.23 Consent to Lodge

This template is for use with a new home building contract to obtain consent from the owners of the land to lodge the require applications for construction. Price incl GST

  • $30

Template - 06.25 Privacy Notice

This template is for use as part of a new home building contract documentation to seek permission from the client for the use of certain information. Price incl GST

  • $30

Template - 06.33 ACC (Authority to Commence Construction)

This template is used as a type of checklist and authority form to confirm that all approvals have been received in order to commence construction. Leaving the construction start up to verbal instructions can lead to premature site starts or incorrect site starts. Price incl GST

  • $30

Template - 06.41 Pre Handover Letter

This template is for a letter sent to client/s prior to the handover stage to prepare them. Price incl GST

  • $30

Template - 06.42 Notice of Practical Completion Letter

This template is for the formal Notice of Practical Completion advising when the new home is ready to be handed over. Price incl GST

  • $30

Template - 06.43 Handover Letter

This template is for the handover letter that covers all the additional information needed to communicated to the client/s at handover that shouldn't be part of the Notice of Practical Completion. Price incl GST

  • $30

Template - 06.44 Maintenance Letter

This template is for advising client/s about the process for maintenance requests and completing any warranty work on their new home. Price incl GST

  • $30

Template - 06.45 Maintenance Request Acknowledgement Letter

This template is for a letter acknowledging a request for maintenance from a client. Price incl GST

  • $30

Template - 06.46 Maintenance - Not at Home Letter

This template is for advising your client/s that they were not home when your representative arrived to undertake some maintenance work or actions. Price incl GST

  • $30

Template - 06.47 Maintenance - Uncontactable Letter

This template is for use when you are unable to contact your client/s to arrange for maintenance or to close off the warranty period. Price incl GST

  • $60

Template - 06.57 Special Conditions of Contract

This template sets out a suggested list of 'special conditions' that should be referenced in a new home building contract. Price incl GST

  • $30

Template - 06.58 Customer Care Policy

This template is for the development of a Customer Care Policy and is a foundation of great customer service. Price incl GST

  • $60

Template - 06.60 Home Owner's Manual

This template is for the development of a Home Owner's Manual. This would be used to educate new home owners on their obligations for maintenance required on their home Price incl GST

  • $30

Template - 08.19 Late and Short Report

This template is to capture all the instances when deliveries were either late or short supplied from the various suppliers in the preceding week and indicate how much production was lost. Price incl GST

  • $30

Template - 08.22 Overhead Power Line Advice

This template is used for advising contractors and suppliers, particularly new ones, of their responsibilities when working near overhead power lines  Price incl GST

  • $30

Template - 08.23 Manual Purchase Order Form

This template is for use when needing a manual purchase order form. Price incl GST

  • $30

Template - 08.24 Labour Allocation Report

This template is for use when  doing the weekly labour allocation for the construction team.  Price incl GST

  • $30

Template - 08.30 Construction Meeting

This template is used for creating the agenda and minutes of a weekly Construction Meeting. Price incl GST

  • $30

Template - 09.09 Record of Interview

This template is used for the recording of the discussions during an interview with a potential employee.  Price incl GST

  • $60

Template - 09.10 Staff Performance Review

This template is for a staff performance review document. It covers all the parts of a 'best practice' performance review. It can be used for all staff members. Price incl GST

  • $30

Template - 09.13 Employee Change of Details

This template is used for an employee to request changes to his/her details with the employer, such as home address, private email address, etc.  Price incl GST

  • $30

Template - 09.14 New Employee Details

This template is used for obtaining and actioning the personal details of new employees. Price incl GST

  • $20

Template - 09.16 Email Payslip Request Form

This template is used for employees to request their payslip be emailed to them rather than by mail or handed to them. Price incl GST

  • $30

Template - 15.03 Trade Contractor - Standing Agreement

This template can be used to create an agreement for trade contractors that covers a nominated period of time. It relies upon using a purchase order to complete the legal agreement.  Price incl GST

  • $30

Template - 16.06 Training Matrix

This template is used to bring together all the training that will occur in the business over the year so any duplication or gaps can be identified. Price incl GST

  • $20

Template - 18.05 Time Sheet